just-in-time.

We surface lead-time risk at the design stage - long before it blows your schedule.

Get a lead time for every part in your project.

The rescheduling loop

The delays are already designed in. You just feel them later.

The steel schedule gets set during design. The real lead times live downstream. So the loop starts:

Drawings go to the fabricator. The fabricator checks mill availability. The mill says half the parts are six months out. Drawings come back for rework - for every fabricator, every revision.

“The bottleneck was never in fabs: we made fabrication 5× faster but the steel was still late.”

STEEL ROBOTICS · ORIGIN

How it works

From drawings to lead times in one upload.

  1. Upload

    Drop in your Design Docs or BOM. PDF, spreadsheet, IFC - whatever you have.

  2. Match

    We check every part against live material availability and mill production schedules.

  3. See

    Get lead times and risk flags for each part - at the design stage, while you can still change the plan.

Why design-stage

Fixing the schedule starts at design - not at the fab.

Speeding up fabrication doesn’t help if the steel arrives late. The real lever is seeing lead-time risk early, while the design can still flex. Surface it at the design stage and the steel package becomes predictable.

01
Predictable lead times
Every part timed against real material availability and mill schedules.
02
Fewer schedule slips
Risk is surfaced before the timeline gets locked in.
03
Decisions while they still matter
Change the plan at the stage where change is still cheap.
Onboarding early projects

See your lead-time risk early.

Book a demo and we’ll map your steel package against real mill lead times - while the design can still change.