The steel-timeline platform
Your steel package,
just-in-time.
We surface lead-time risk at the design stage - long before it blows your schedule.
Get a lead time for every part in your project.
The rescheduling loop
The delays are already designed in. You just feel them later.
The steel schedule gets set during design. The real lead times live downstream. So the loop starts:
Drawings go to the fabricator. The fabricator checks mill availability. The mill says half the parts are six months out. Drawings come back for rework - for every fabricator, every revision.
“The bottleneck was never in fabs: we made fabrication 5× faster but the steel was still late.”
→ rework
How it works
From drawings to lead times in one upload.
-
Upload
Drop in your Design Docs or BOM. PDF, spreadsheet, IFC - whatever you have.
-
Match
We check every part against live material availability and mill production schedules.
-
See
Get lead times and risk flags for each part - at the design stage, while you can still change the plan.
Why design-stage
Fixing the schedule starts at design - not at the fab.
Speeding up fabrication doesn’t help if the steel arrives late. The real lever is seeing lead-time risk early, while the design can still flex. Surface it at the design stage and the steel package becomes predictable.
See your lead-time risk early.
Book a demo and we’ll map your steel package against real mill lead times - while the design can still change.